Net-billing is a DISCO file, not a shop SKU.

Every competitor site says “we handle net-metering.” New files after 9 Feb 2026 are net-billing. Export ~Rs 8–13, import Rs 37–55. Green-meter price is the demand notice.

The rules

What changed, and what still works.

New files

Prosumer Regulations 2026. 5-year agreement. Size ≤ sanctioned load, max 1 MW. You must own the roof. ≤25 kW: DISCO approves, no separate NEPRA license (Aug 2026).

Grandfathered

Agreements executed before 9 Feb 2026 keep 1:1 until they expire (SRO 547). Pending files that had paid demand notices were later directed onto the old frame. Confirm in writing with your DISCO.

The money

NAEPP posted ~Rs 8.13/kWh for 2026; street talk Rs 10–13. Calculator uses Rs 11. Size PV to self-use. Filing is optional if you never export.

Documents

What every DISCO actually asks for.

You bring

CNIC. Latest electricity bill. Proof of ownership (registry / allotment) or owner NOC if you are a tenant. Site photographs. Application form of that DISCO.

We / the installer bring

Single-line diagram. Inverter datasheet (anti-islanding). Plate flash / serial list. Earthing test. Installer agreement. PPIB/AEDB paper if the size still needs it. Generation licence is gone for ≤25 kW.

Then: inspection → demand notice (meter + security) → you pay the DISCO, not the shop → AMI / green meter swap → connection order. Shop “green meter Rs 18,500” and DISCO AMR are different products.

DISCO map

Who files where, and how long people wait.

DISCOCities we size forStreet wait (2026 talk)Notes
LESCOLahore, Sheikhupura, Kasur, Nankana6–12 weeksVolume residential. Three-phase often demanded above ~5 kW.
K-ElectricKarachi8–16 weeksOwn tariff schedule. Roof ownership is strict after Feb 2026.
IESCOIslamabad, Rawalpindi, AJK edge, Attock4–10 weeksCDA / DHA / cantonment NOCs on top of the DISCO file.
FESCOFaisalabad, Jhang, Toba, Sargodha edge8–16 weeksIndustry + tube-well files common.
MEPCOMultan, Bahawalpur, DG Khan, SahiwalOften slowerAgri + house mix. Confirm circle office, not a WhatsApp agent.
GEPCOGujranwala, Sialkot, Gujrat8–16 weeksIndustry roofs. 3-phase default on mills.
PESCOPeshawar, Mardan, Abbottabad, SwatVariableCheck sanctioned load on the bill before you pad kW.
HESCO / SEPCOHyderabad, Sukkur, LarkanaVariableHeat derate matters more than the file.
QESCOQuetta, Gwadar (check KE vs QESCO)VariableHigh PSH. Salt air on the coast = aluminium iron.

Waits are installer-floor ranges, not DISCO SLAs. We do not sell a “guaranteed 15-day green meter.”