Glossary · Basics · Basic · Pakistan 2026

Peak sun hours are not clock hours of daylight.

One peak sun hour is 1000 W/m² for one hour. A 6.45 kW array in 5.1 PSH does not make 6.45 × 5.1 kWh — you still derate for heat, dust, mismatch and the box.

People also search peak sun hours lahore solar hours pakistan psH

Key takeaways

What it is

PSH is a site climate number. Karachi ~5.4, Lahore ~5.1, Quetta ~5.8, Peshawar ~4.9, Multan ~5.3. These are the values in our city pages and calculator.

In Pakistan 2026

May in Multan is not February in Murree. A quote that uses 6 PSH everywhere is selling a desert that you do not live in. Dust in south Punjab and smog in Lahore are why we derate 0.78 instead of 0.85.

How we spec it

Pick the city in the calculator. Do not type 6 because a Facebook reel said Germany uses 4 and Pakistan must be 7.

Numbers you can actually use

Street ranges, not a quotation. Confirm the carton the week you book.

Thing2026 numberHow to use it
Lahore PSH5.1Smog + monsoon
Karachi PSH5.4Humidity, salt, better winter
Quetta PSH5.8High, dry, cold Voc mornings
Derate we use0.78Heat, dust, cable, inverter

PSH vs sunshine hours

A 13-hour June day is not 13 PSH. Morning and evening are weak. PSH compresses the area under the irradiance curve into equivalent noon hours. That is why a 5 kW plant does not run a 5 kW load from 6 am to 7 pm.

Worked example — Karachi

Take a 6 kW-class hybrid in Karachi (K-Electric, ~5.4 PSH). 10 × 645 W is 6.45 kW DC. Derated yield ≈ 6.45 × 5.4 × 0.78 ≈ 27.2 kWh on a clean day — then salt air and aluminium iron. This page (Peak sun hours (PSH)) is the piece of that plant people skip on WhatsApp. If your quote cannot survive this Karachi sentence, it will not survive May. Open the calculator with city set to Karachi, and the lookup map for a stocking dealer — not a green-meter SKU.

Keywords this lesson actually answers

People land here asking peak sun hours lahore, solar hours pakistan, psH. The honest 2026 answers still collapse to: N-type plates with flash, IP65 hybrid with GRID vs LOAD, 51.2 V LFP on CAN, 14 SWG, XLPO, derate 0.78, and net-billing at ~Rs 11 export if you file with K-Electric. Everything else on this page is how not to get robbed while buying those things.

Internal links worth clicking before you pay

Size: system sizing · Policy: net-billing · Battery: LFP · Buy: checklist · Shops: near you · City climate: Karachi · Numbers: calculators.

How shops fail this

WALK AWAY

6 PSH used for every city

6 PSH used for every city

WALK AWAY

Nameplate kW × PSH with no derate

Nameplate kW × PSH with no derate

WALK AWAY

Ignoring soiling for 3 months

Ignoring soiling for 3 months

FAQ — Peak sun hours (PSH)

Does rain count as PSH?

Monsoon weeks drop yield. Annual PSH already averages that. Do not size January from a March brochure.

Why not 0.85 derate?

STC is 25 °C cell. Roof tiles in May are not 25 °C. 0.78 is pessimistic on purpose.

Can bifacial beat PSH?

A little, on high bright iron. It does not turn Lahore into Quetta.

Read next

glossary

Derating

Nameplate watts are a laboratory. Derate is the roof.

glossary

STC (standard test conditions)

STC is a laboratory noon that your roof will never be.

glossary

NOCT

NOCT is the less-fake wattage on a warm roof.

guide

How to size a solar system

Start from kWh and shed hours, not from a package name.

glossary

kW (kilowatt)

kW is how fat the pipe is — not how much you used today.

glossary

kWh (kilowatt-hour)

kWh is the unit on your bill — the bucket, not the tap.

Open the calculators Shops near you All lessons

Educational page, September 2026. Not a DISCO filing, not a live quotation, not medical or bank advice. SRO 251(I)/2026 net-billing for new files after 9 Feb 2026.